On Samsø, the project involved the construction of a new stable building. The excavation and base were established first. Then DurusEasyFinish fiber concrete was used in the ground floor, which was to be used throughout the entire barn building. The barn building is approximately 400m2. The effectiveness of using fibers instead of steel reinforcement can be seen in the picture where the concrete leaves the ramp of the truck. The fiber is added to the concrete, after which it is belt transported out. Imagine not having to buy, transport, load/unload, cut, bend, strip and weld rebar, while at the same time reducing the project's CO2 emissions by up to 60% in the ground cover.